Following an on-site system review, the first two Spirovents were installed in an equipment room serving two residence halls with recurring problems.  Positive results were immediate and since that time The University of Delaware has become one of our largest higher-ed customers.  Beyond the academic, research, and residence halls there is a 16" combination air dirt unit installed in the Laird Plant to replace an undersized centrifugal during the plant renovation and a custom fabricated 30" combination unit in the ECUP.

Related Work

Dirt Separator Piping
Install the Spirotrap® typically ahead of the system component being protected, such as the boiler in this drawing.
Eastern Illinois University - Charleston, IL
After having tried numerous other methods, the first Spirovent was installed in Carman Hall to deal with a long history of no heat calls and clogging valves.
American Museum of Natural History - New York, NY
Custom fabricated 30" high velocity air eliminator installed to solve noise problems in the existing system.
Commercial Gallery
Spirovent® is now the basis of design in many specifications by the top consulting engineering firms for new construction.