4" Spirovent® air eliminator being used to control foam in a bottling operation for transmission fluid and motor oil.
Related Work
North Mississippi Medical Center - Tupelo, MS
High velocity 18" combination air eliminator and dirt separator.Penn State University - State College, PA
Penn State is one of our largest university customers with more than 90 units installed across campus.Waukesha Memorial Hospital
The Spirovent was selected and installed to prevent dirt and sediment in the existing system from reaching a new addition and improvements went even beyond that.Industrial Gallery
Spirovents have been installed in many new and existing industrial HVAC systems.Related Work
Air Eliminator Piping
Install the Spirovent® at the point of lowest solubility, which is the place in the system where the temperature is the highest and pressure the lowest.Mosinee School District - Mosinee, WI
“We couldn’t get the chilled water supply temperatu
University of Missouri - Columbia, MO
The University of Missouri, Columbia is home to the second of the world's largest Spirovent® combination air eliminator and dirt separator.University of Nebraska - Lincoln, NE
With close to one hundred Spirovents installed, The University of Nebraska at Lincoln is one of our largest higher-ed customers.Related Work
University of Missouri - Columbia, MO
The University of Missouri, Columbia is home to the second of the world's largest Spirovent® combination air eliminator and dirt separator.Red Rock Casino Resort Spa - Las Vegas, NV
24" high velocity combination air eliminator / dirt separator.Maine Medical Center - Augusta, ME
Three of the larger Spirotherm® products on this multi-system project.Unocal - Pacific Northwest, US
4" Spirovent® air eliminator being used to control foam in a bottling operation for transmission fluid and motor oil.Related Work
Industrial Gallery
Spirovents have been installed in many new and existing industrial HVAC systems.Purdue University - West Lafayette, IN
Spirovent exceeds expectations and leads the University to purchase and install (32) additional units at the village.Potawatomie Bingo Casino - Milwaukee, WI
Two custom fabricated 20" high velocity air eliminators.Maine Medical Center - Augusta, ME
Three of the larger Spirotherm® products on this multi-system project.Related Work
Boehringer Ingelheim - St. Joseph, MO
Custom 20" high velocity dirt and sediment separator with removable top head for access to Spirotube® element bundle.Purdue University - West Lafayette, IN
Spirovent exceeds expectations and leads the University to purchase and install (32) additional units at the village.Air Eliminator Piping
Install the Spirovent® at the point of lowest solubility, which is the place in the system where the temperature is the highest and pressure the lowest.Commercial Gallery
Spirovent® is now the basis of design in many specifications by the top consulting engineering firms for new construction.Related Work
University of Missouri - Columbia, MO
The University of Missouri, Columbia is home to the second of the world's largest Spirovent® combination air eliminator and dirt separator.Residential Gallery
Spirovent® remains the world class standard that others attempt to reach. Often copied but never equaled.IM Flash Technologies - Lehi, UT
Custom 14" all stainless steel high velocity air eliminator for process chilled water.Dirt Separator Piping
Install the Spirotrap® typically ahead of the system component being protected, such as the boiler in this drawing.Related Work
Industrial Gallery
Spirovents have been installed in many new and existing industrial HVAC systems.Eastern Illinois University - Charleston, IL
After having tried numerous other methods, the first Spirovent was installed in Carman Hall to deal with a long history of no heat calls and clogging valves.Mosinee School District - Mosinee, WI
“We couldn’t get the chilled water supply temperatu
American Museum of Natural History - New York, NY
Custom fabricated 30" high velocity air eliminator installed to solve noise problems in the existing system.Related Work
International ALERT Academy, Big Sandy, TX
“I have not had to vent a coil in the three months since
Kansas State University - Manhattan, KS
Following the installation of numerous smaller units on campus that met all expectations, a separator upgrade was proposed for the central plant.Silence is Golden (Yellow) for Berners-Schober
“The pumps are much quieter as is the circulating water
Red Rock Casino Resort Spa - Las Vegas, NV
24" high velocity combination air eliminator / dirt separator.Related Work
International ALERT Academy, Big Sandy, TX
“I have not had to vent a coil in the three months since
Mercy Medical Center - Des Moines, IA
High velocity 18" combination air eliminator and dirt separator.Boehringer Ingelheim - St. Joseph, MO
Custom 20" high velocity dirt and sediment separator with removable top head for access to Spirotube® element bundle.Industrial Gallery
Spirovents have been installed in many new and existing industrial HVAC systems.Related Work
Waukesha Memorial Hospital
The Spirovent was selected and installed to prevent dirt and sediment in the existing system from reaching a new addition and improvements went even beyond that.International ALERT Academy, Big Sandy, TX
“I have not had to vent a coil in the three months since
Red Rock Casino Resort Spa - Las Vegas, NV
24" high velocity combination air eliminator / dirt separator.Cottey College - Nevada, MO
From the President's house to the power plant, to almost all buildings on campus, Spirovents have contributed to efficient system performance across the campus.Pages
